You are here

Electric Vehicle Charging Stations, Safer Crosswalks Coming To Cape Cod National Seashore

Share

Published Date

November 2, 2019

Safer pedestrian highway crossings and electric vehicle charging stations are coming to Cape Cod National Seashore.

Cape Cod National Seashore Superintendent Brian Carlstrom says work is beginning on the installation of a pedestrian crossing beacon at the intersection of Governor Prence Road and Route 6 near the Captain Penniman House in Eastham, Massachusetts. The pedestrian beacon was included in a 2012 Transit in the Parks federal earmark entitled “Improve pedestrian and bicycle crossings of major roadways using self-activated flashing beacons and a hybrid pedestrian beacon.” The self-activated flashing beacons were installed several years ago at the following locations:

1. Marconi Site Road and Cape Cod Rail Trail, Wellfleet
2. Moors Road at Herring Cove Beach area, Provincetown
3. Race Point Road and Beech Forest Parking Lot, Provincetown
4. Race Point Road and Province Lands Bike Trail at Airport, Provincetown  
5. Cape Cod Rail Trail at Nauset Road near Railroad Avenue, Eastham

The High intensity Activated crosswalk pedestrian crossing beacon will be located at a curve on high speed, high volume, four-lane State Route 6, which is under the jurisdiction of the Massachusetts Department of Transportation. The beacon is intended to contribute to improved safety for pedestrians in the area.  Additionally, the HAWK pedestrian beacon is a new and innovative device unfamiliar to most motorists.

The contractor began to mobilize on site on October 28 and put up construction signage. They will excavate for electrical conduit, and install curbing and sidewalks. Work will also include directional drilling under the roadway for the electrical power (no open trench in the road to impact traffic), and installation of concrete bases for the crossing signal mast arms and poles. Work this fall should take 3-4 weeks total. The mast arms, poles, and fixtures will be installed in mid to late spring (April-May) and the signal is scheduled to be operational by the summer of 2020.

Thanks to a partnership between the National Park Foundation, National Park Service, Department of Energy, and BMW of North America, four electric vehicle charging stations for the public have been installed at the Wellfleet Town Hall parking area to serve the towns and Cape Cod National Seashore. The availability of this option will expand access for EV destination travel and help reduce air pollution in parks and gateway communities.

“Cape Cod National Seashore staff are excited to help support our gateway communities through this innovative partnership,” said Superintendent Carlstrom. “The presence of multiple EV charging stations in Wellfleet Center provides a great new opportunity toward an energy efficient future for Outer Cape residents and visitors.”

This national project kicked off in April 2017 with the first electric vehicle charging stations installed at Thomas Edison National Historical Park in New Jersey.

With the installation of charging stations at the Wellfleet Town Hall parking area complete, an integrated team from this public private partnership is continuing to install charging stations in or near additional national park areas. When identifying site locations, the team is considering factors such as proximity and strength of EV markets, distance from nearby charging locations, and natural and cultural landscape considerations. Dozens of parks and site hosts have expressed interest, exploring site options and completing installations.

The Department of Energy’s Vehicle Technologies Office has provided technical assistance that supports innovative energy saving transportation projects at national park sites. These projects educate visitors on the benefits of advanced and alternative fuel vehicles and can help the National Park Service meet its energy, economic, and environmental goals. The benefits of these projects have the opportunity to reach far beyond the boundaries of the national parks.

“Electric vehicle drivers can look forward to enjoying the quintessential national park road trip as more charging stations are added across the country,” said Will Shafroth, president of the National Park Foundation. “Not only will drivers benefit, but also the businesses and communities at the doorstep of our treasured national parks.”

Related Stories:

Support National Parks Traveler

National Parks Traveler is a small, editorially independent 501(c)(3) nonprofit media organization. The Traveler is not part of the federal government nor a corporate subsidiary. Your support helps ensure the Traveler's news and feature coverage of national parks and protected areas endures. 

EIN: 26-2378789

Support Essential Coverage of Essential Places

A copy of National Parks Traveler's financial statements may be obtained by sending a stamped, self-addressed envelope to: National Parks Traveler, P.O. Box 980452, Park City, Utah 84098. National Parks Traveler was formed in the state of Utah for the purpose of informing and educating about national parks and protected areas.

Residents of the following states may obtain a copy of our financial and additional information as stated below:

  • Florida: A COPY OF THE OFFICIAL REGISTRATION AND FINANCIAL INFORMATION FOR NATIONAL PARKS TRAVELER, (REGISTRATION NO. CH 51659), MAY BE OBTAINED FROM THE DIVISION OF CONSUMER SERVICES BY CALLING 800-435-7352 OR VISITING THEIR WEBSITE. REGISTRATION DOES NOT IMPLY ENDORSEMENT, APPROVAL, OR RECOMMENDATION BY THE STATE.
  • Georgia: A full and fair description of the programs and financial statement summary of National Parks Traveler is available upon request at the office and phone number indicated above.
  • Maryland: Documents and information submitted under the Maryland Solicitations Act are also available, for the cost of postage and copies, from the Secretary of State, State House, Annapolis, MD 21401 (410-974-5534).
  • North Carolina: Financial information about this organization and a copy of its license are available from the State Solicitation Licensing Branch at 888-830-4989 or 919-807-2214. The license is not an endorsement by the State.
  • Pennsylvania: The official registration and financial information of National Parks Traveler may be obtained from the Pennsylvania Department of State by calling 800-732-0999. Registration does not imply endorsement.
  • Virginia: Financial statements are available from the Virginia Department of Agriculture and Consumer Services, 102 Governor Street, Richmond, Virginia 23219.
  • Washington: National Parks Traveler is registered with Washington State’s Charities Program as required by law and additional information is available by calling 800-332-4483 or visiting www.sos.wa.gov/charities, or on file at Charities Division, Office of the Secretary of State, State of Washington, Olympia, WA 98504.

Add comment

CAPTCHA

This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.

Image CAPTCHA
Enter the characters shown in the image.

Your support helps the National Parks Traveler increase awareness of the wonders and issues confronting national parks and protected areas.

Support Our Mission

INN Member

The easiest way to explore RV-friendly National Park campgrounds.

The Essential RVing Guide to the National Parks

Here’s the definitive guide to National Park System campgrounds where RVers can park their rigs.

Our app is packed with RVing- specific details on more than 250 campgrounds in more than 70 national parks.

You’ll also find stories about RVing in the parks, tips helpful if you’ve just recently become an RVer, and useful planning suggestions.

The Essential RVing Guide to the National Parks

FREE for iPhones and Android phones.